The small-business app launch checklist.
Most small-business apps fail in the gap between "we should build an app" and "we shipped one." Here's the exact week-by-week checklist we walk every client through — and you can use it whether we're building for you or not.
Before week 1 — the pre-flight check
- One sentence to describe the app. If you can't, you don't have an app yet — you have an area of interest.
- One core action. Customers do what, exactly?
- Who logs in. Customers? Staff? Admins? Each one is a screen-set you'll need.
- What it must integrate with. Stripe, Xero, your POS, your existing website — write the list now.
- A rough launch deadline. Without one, your build will silently expand.
Week 1 — discovery (1–2 days, max)
Not a 6-week phase. A 2-day conversation that produces three artefacts: a one-page scope, a feature list with anything 'maybe' explicitly removed, and a definition of "done". Anything more is theatre.
Week 1–2 — design
Wireframes for every screen. Then a clean design language — not Picasso, just legible, branded, consistent. Sign-off happens at the end of week 2 so engineering can start. If design drags past week 3, the whole timeline drifts.
Week 2–7 — engineering
Weekly demo on a fixed day. You see the actual app running, on your phone, every week. Tasks for each stage are visible. Surprises happen now (when they're cheap), not at launch (when they're catastrophic).
Week 6 — App Store / Play submission prep
Most builds underestimate this. You need: privacy policy, terms of service, screenshots (5–10), app icon, store listing copy, age rating, support URL, support email. Start collecting these in week 4, not week 8.
Week 7 — beta testing
3–10 friendly users for 3–4 days on TestFlight + Google Play internal track. Not for finding bugs (your developer should have done that) — for finding the awkward moments. Tap-points that don't feel right. Wording that confuses. Fix the obvious ones.
Week 8 — launch
Submit to App Store and Play. Plan for 24–72 hours review (sometimes longer for Apple). Web app: deploy. Send the launch email/post the same day you go live. Don't "soft-launch" silently — your first 48 hours are when you get the most goodwill.
After launch — week 9 onwards
- Day 1–7: watch crashes, fix anything critical the same day
- Week 2–4: first small update with the polish items from beta
- Month 2+: measure actual usage, not assumptions
- Always: reply to every review